A custom rotary union price quote should identify exactly what will be supplied, the operating conditions it is designed to handle, how it connects to the equipment, and what testing and support are included. It should also separate the unit price from engineering, tooling, accessories, freight, and other charges. Without those details, two apparently similar quotations can describe assemblies with different capabilities and installation requirements.
The strongest starting point is a quotation tied to a specific drawing revision and an agreed operating specification. That connection makes the price traceable: changes to the media, speed, passages, materials, or mounting arrangement can then be evaluated against a defined scope.
A quotation should state the conveyed medium, pressure, temperature, rotational speed, and required flow for each passage. “Water service” or “hydraulic service” leaves too much unresolved. Cooling water containing abrasive particles presents different sealing demands from filtered water, while hydraulic fluids with different additive packages require compatible elastomers and seal materials.
Specify normal operation and the most demanding expected conditions separately. Startup temperature, pressure surges, intermittent rotation, reverse rotation, and periods without fluid flow can affect the design. A union intended for continuous wet operation should not be assumed suitable for running dry during machine setup.
Pressure, temperature, and speed ratings must apply to the agreed operating combination. A maximum pressure listed beside a maximum speed does not establish that both are permissible simultaneously. The quote should confirm the duty point and identify any restrictions, such as reduced pressure at elevated temperature or a speed limit with a particular seal arrangement.
For multiple passages, include a passage schedule showing the medium, flow direction, pressure, temperature, and flow requirement for every circuit. Adjacent passages operating at different pressures create a cross-leakage concern. The design and test scope should address isolation between circuits as well as leakage to atmosphere.
Flow requirements also need a useful reference point. A port size alone does not establish flow capacity because internal passages and changes in direction create pressure loss. If available pressure is limited, request the pressure-drop basis at the specified flow and fluid condition. Distinguish a calculated estimate from a measured result.
The quoted assembly should be linked to an identifiable drawing, including its revision and approval status. An outline drawing is useful for early pricing, but manufacturing requires agreement on the dimensions that govern fit and function. The quotation should explain whether final engineering is included and when the approval drawing will be issued.
Connection details deserve particular attention. Thread diameter alone is insufficient: pitch, thread form, taper or parallel geometry, sealing method, and engagement length all matter. A connection that screws into place can still fail to seal correctly or leave inadequate clearance for the adjacent hose fitting.
The same distinction answers the related question, “How can I check whether a new quick coupling will fit my existing hydraulic connector?” Identify the existing coupling series or interchange profile, mating dimensions, sealing arrangement, pressure rating, and fluid compatibility. Matching nominal size or appearance does not prove interchangeability. The hose-side thread and the mating coupling profile are separate interfaces, and both require confirmation.
For the rotating assembly itself, the drawing should establish:
Clarify which components provide support and which prevent rotation. Rigid pipework used unintentionally as a restraint can transmit loads into the housing. If the assembly requires a bracket, flexible hose section, or specific restraint geometry, its supply and installation requirements belong in the quote.
Replacement projects need an additional distinction: matching the old unit’s external dimensions does not prove that its internal flow paths, torque behavior, or drain arrangement are equivalent. Any proposed departure from the existing interface should be visible before price approval.
A useful material description identifies the wetted parts, sealing faces, secondary seals, and relevant surface treatments. A broad description such as “stainless steel construction” leaves open whether it refers to the housing alone or also to the shaft and internal passages. Material grades should be stated where corrosion resistance or mechanical strength affects suitability.
Seal-face selection should follow the fluid and operating conditions. Abrasive contamination, poor lubrication, thermal cycling, and dry running place different demands on the sealing pair. The quotation should name the proposed face materials and explain any operating restriction that follows from their selection.
Elastomer compatibility requires similar precision. Suitability for one oil does not establish suitability for another fluid or for the cleaning chemicals introduced during maintenance. Include cleaning media and flushing procedures in the specification when they contact the seals.
Special coatings, hardened surfaces, corrosion-resistant components, or upgraded bearings should appear as identifiable scope items. If an alternative construction is offered at a different price, its operating limits and maintenance implications should be stated alongside the price difference. This allows the alternatives to be compared without assuming equal service capability.
A quotation that promises testing should describe the test method, conditions, acceptance criteria, and documentation. A stationary pressure test establishes different evidence from a test performed during rotation. Neither automatically demonstrates performance at the complete operating combination specified for the machine.
The agreed test scope should resolve several distinct questions:
Acceptance criteria must suit the sealing arrangement. A blanket promise of “zero leakage” can obscure the difference between unacceptable external leakage, controlled seal leakage, and leakage routed through a drain. The quote should define what is acceptable and where it is measured.
Also distinguish functional testing from pressure containment testing. A proof test does not establish long-term service life, and a brief rotational test does not reproduce every operating cycle. Any endurance test requires an agreed procedure and a clear statement of what result it is intended to demonstrate.
The commercial section should show the price for the defined quantity and identify one-time charges separately. Custom engineering, prototype manufacture, tooling, special fixtures, and nonstandard testing can materially change the initial order value. Repeat-order pricing should make clear which charges disappear and which remain.
Specify the currency, quotation validity, payment schedule, and quantity assumptions. Where several quantities are priced, each tier should refer to the same technical scope unless the differences are explicitly listed. A lower price based on a different material or reduced test scope is a different offer.
The supply boundary needs equal clarity. Hoses, quick couplings, mounting brackets, adapters, seals, and fittings should be marked as included, separately priced, or excluded. Descriptions such as “complete assembly” are insufficient if the drawing shows accessories that are supplied elsewhere.
Delivery terms should identify the named destination or handover point and the allocation of freight, insurance, duties, and taxes. Packaging deserves a line item when the assembly requires corrosion protection, sealed ports, special handling, or storage preparation. These details affect the delivered condition and the total amount payable.
For custom development, establish how revisions are priced. A changed connection after drawing approval can require new machining or replacement parts. The quotation should state how technical changes affect cost and schedule, and whether previously completed engineering or tooling remains usable.
Lead time should be tied to a clear event: order acceptance, receipt of payment, approval of the final drawing, or availability of required application data. “Delivery in several weeks” is incomplete when engineering approval must happen first.
A development order can require separate milestones for drawing submission, prototype completion, testing, and shipment. Distinguishing these stages exposes where a decision or missing dimension could delay the order. It also clarifies whether the quoted date refers to dispatch or arrival at the specified destination.
If a sample or existing assembly must be supplied for measurement, define whether its return is included and whether dismantling is necessary. Reverse engineering an external interface cannot establish unknown operating conditions or the internal condition of a worn component.
Warranty terms should state their duration, starting point, covered defects, exclusions, and the remedy available. Repair, replacement, and return arrangements have different practical consequences. Responsibility for removal, reinstallation, transport, and diagnostic work should be explicit.
Operating limits must align with the warranty wording. If dry running, contamination, misalignment, or unsupported hose loads are excluded, the installation and maintenance documents should define the relevant requirements. Vague exclusions make it difficult to distinguish a product defect from an application problem.
Include the documentation supplied with the assembly: the approved drawing, passage identification, installation instructions, operating restrictions, and maintenance guidance appropriate to the design. If field repair is supported, identify available seal kits and any tools or procedures required. Spare-part availability and repair lead time should be addressed separately from the initial manufacturing schedule.
For paid custom engineering, clarify ownership and permitted use of drawings, tooling, and fixtures. Establish whether a repeat order will use the approved design revision and how substitutions will be communicated. A replacement seal material or revised internal geometry can affect compatibility even when the outside dimensions remain unchanged.
Before accepting the quotation, resolve every open technical item that could alter the price or installation. A preliminary estimate is useful during design development, but the production order needs an agreed specification, identifiable drawing, defined acceptance criteria, and a complete commercial scope. Those references give the delivered assembly a clear basis for inspection and acceptance.
Need a formal quotation for your custom rotary union? Send your operating medium, pressure, temperature, passage count and quantity. Our engineering team will prepare a detailed quote with full technical documentation.